restructuring and
Crystal Terrace Belenos
Land: 1,200 m2
Construction: 30 m2 terrace, 31 linear meters of retaining wall.
Year: 2020
Engineering, architecture and logistics challenge, derived from a failure in the construction process of the terrace that was in a ravine. We carry out a Structural Safety Opinion to determine the causes, consequences and solutions to the problem.
As a result of the structural, architectural and calculation project, we carried out
a masonry retaining wall, we fill the ravine and thus we win
more than 120 square meters of garden.
We remodeled the terrace and as the main element a 20mm tempered glass floor.